Skip to main content

Constantin Floors

Floor Leveling

Every great floor starts with a level surface

Uneven floors affect how your home looks, feels, and performs. Before any flooring goes down, the surface beneath must be flat, solid, and stable. Constantin Floors corrects both uneven concrete slabs and uneven subfloors — so your finished floor lasts.

Bouncy or springy floors

CONCERN

Cracked grout lines

CONCERN

Visible dips or humps

CONCERN

Hollow sound when walking

CONCERN

Know the Difference

Concrete vs. Subfloor Leveling

Concrete Leveling

Corrects unevenness in bare concrete slabs. The right service when flooring installs directly on concrete — basement floors, slab-on-grade construction, garage conversions.

Basement finishing projects

Slab-on-grade first floors

Garage-to-living conversions

New construction prep

After removing old adhesive

Subfloor Leveling

Corrects unevenness in the wood platform above the joists. The right service in most multi-story homes where flooring installs over plywood or OSB subfloor panels.

Multi-story home renovations

Older homes with settled joists

Replacing carpet or vinyl over wood

Squeaky or springy floor areas

Tile installation over wood subfloor

Not sure which applies to you? We identify the correct approach during the free estimate — no guesswork needed on your part.

Why It Matters

Proper flooring starts below the surface

Every flooring type — hardwood, LVP, tile, or laminate — is designed to perform on a flat, stable surface. When that surface is uneven, the flooring above it will show it: cracked grout, squeaky planks, lifted edges, hollow spots, and premature wear.

The problem can come from two different places. In homes built on a concrete slab, the slab itself is almost never poured perfectly flat. In multi-story homes, the wood subfloor platform settles, shifts, and develops low spots over time.

Constantin Floors addresses both. We assess the surface, identify the cause, and correct it before a single plank goes down — so your floor looks right and stays right.

Section 01

Concrete Leveling

Concrete Leveling

Concrete slabs are poured, not machined. They settle unevenly over time, develop low spots from soil movement, and carry high spots from troweling. This is completely normal — and completely correctable.

We address concrete unevenness with two methods: grinding high spots flush, and filling low spots with self-leveling underlayment (SLU) — a pourable cement compound that finds its own level and cures hard within 24 hours.

FLATNESS TOLERANCES — BY FLOORING TYPE

Tile (porcelain/ceramic)
1/8" per 10 ft
Hardwood · LVP · Laminate
3/16" per 10 ft

Most slabs deviate 1/2"–1" or more without correction.

Our Concrete Assessment Covers

Every slab assessment includes moisture, pH, and flatness

Flatness deviation

Moisture vapor emission

pH surface levels

Cracks and spalling

Prior adhesive presence

Slab structural integrity

When It's Needed

Common situations that require concrete leveling

01

Before any flooring over concrete

Any time flooring goes directly on a slab — basement, first floor, garage conversion — the flatness must be verified and corrected first.

02

Hollow spots under tile or hardwood

A hollow thud when walking across tile or hardwood means the floor has lost contact with the substrate — often traced to a low spot in the concrete beneath.

03

Basement finishing projects

Basement slabs almost always need leveling before LVP, tile, or wood is installed. Water damage and frost heaving create significant unevenness over time.

04

After removing old adhesive

Old vinyl adhesive and tile thinset leave the concrete uneven. Grinding and leveling after demo is standard practice before a new floor goes down.

Section 02

Subfloor Leveling

Subfloor Leveling

In most Rhode Island homes, the flooring you see is installed on top of a wood platform — the subfloor — which itself sits on a series of joists. Over years of settling, moisture exposure, and normal use, that platform develops unevenness.

An uneven subfloor causes every flooring type above it to show problems: tile grout cracks, hardwood develops dips, LVP joints flex and separate, laminate squeaks underfoot. Correcting the subfloor before installation is not optional — it's what determines whether the finished floor looks and feels right for its entire lifespan.

Signs Your Subfloor May Need Leveling

Springy or bouncy floors

Visible dips or humps

Creaking or squeaking underfoot

Cracked grout or separated seams

Gaps between flooring planks

Doors that stick or rub the floor

Result

Concrete prep enables perfect installation

Drag the slider. Bare concrete slab prepared and leveled — then ready for new LVP installation.

After
Before

BEFORE

AFTER

Result

Concrete prep enables perfect installation

01

How do I know if my floors need leveling?

Walk through your home and listen for springy, bouncy, or squeaky areas. Look for visible dips, humps, or cracked grout lines. If tile or hardwood feels uneven underfoot, or you notice gaps between planks, the surface beneath is likely not flat. We assess all of this at no charge during the estimate visit.
02

What is self-leveling compound?

Self-leveling underlayment (SLU) is a cement-based material mixed with water to a pourable consistency. Applied over a prepared surface, it flows to find its own level. Once cured — typically 24 hours — it provides a hard, flat surface ready for any flooring type.
03

How flat does a floor need to be before installing flooring?

It depends on the flooring type. Tile requires the strictest tolerance: 1/8" deviation over 10 feet. Hardwood, LVP, and laminate all require no more than 3/16" over 10 feet. Most floors deviate more than this without professional leveling.
04

What's the difference between concrete leveling and subfloor leveling?

Concrete leveling addresses unevenness in a bare concrete slab — typically found in basements, garages, and slab-on-grade construction. Subfloor leveling addresses unevenness in the wood platform above the joists — typically found in multi-story homes. Both need to be corrected before flooring goes on top.
05

How long does floor leveling take?

Most leveling projects complete in one day. Concrete self-leveling compound allows foot traffic within 4–6 hours and flooring installation within 24 hours. More extensive corrections — multiple lifts, structural shimming, or large areas — may extend to two days. We provide a specific timeline during the estimate.
06

Is floor leveling included in a flooring installation estimate?

We assess the floor surface as part of every flooring estimate at no charge. If leveling is needed, we scope and price it clearly — no surprises after the job starts. Some leveling is minor enough to include at no additional cost; deeper corrections are quoted separately.

Result

Concrete prep enables perfect installation

Diagnostic Indicators

When concrete leveling is needed

recent projects
Providence, RI

Rustic Weathered Hardwood Installation

Wide-plank character-grade hardwood featuring rich tone variation and weathered details, nail-down installation over a fully prepared subfloor. The homeowners wanted a warm, rustic-yet-refined look — delivered exactly that.

recent projects
Cranston, RI

Warm Rustic Hardwood Installation

Wide-plank character-grade hardwood featuring rich amber and warm brown tone variations, nail-down installation over a fully prepared subfloor. The homeowners wanted a cozy, grounded contrast against the crisp white subway tile — delivered exactly that.

recent projects
Warwick, RI

Classic Red Oak Hardwood Installation

Traditional-width red oak hardwood featuring rich, warm amber and reddish-brown undertones with a polished protective finish, nail-down installation over a fully prepared subfloor. The homeowners wanted a timeless, classic warmth — delivered exactly that.

Ready to Transform Your Space?

Every project starts with a conversation. Reach out to discuss your vision and receive a free, no-obligation estimate.